Track Design & Rail Access

Plan the railroad before the site plan is locked.

LA&L helps customers, developers, property owners, and project teams evaluate practical rail access before buildings, roads, utilities, loading areas, and construction decisions limit the options.

01Conceptual alignmentConnection, length, curves, grade, and site fit.
02Operating reviewSwitching, capacity, spotting, loading, and service.
03Engineering coordinationQualified consultants, railroad standards, and approvals.
04Construction readinessScope, partners, schedule, access, and service preparation.
Rail Access Begins Early

A rail siding is part of the operation—not an isolated line on a drawing.

A workable track plan must connect the railroad, the facility, the loading method, the railcars, the truck circulation, and the expected flow of material through the site. Each decision affects the others.

LA&L can help define the operating questions, review early concepts, identify potential constraints, and coordinate with qualified engineers, contractors, utilities, property owners, and development partners.

The most valuable time to involve the railroad is before the building footprint, roadway, stormwater system, utilities, and loading areas are finalized.
Project Path

Move from an early idea to a constructible rail-access plan.

Select a stage to see how a strong project develops. The exact sequence varies by site, but the same core questions must be answered.

Stage 01

Begin with the freight and the operating need.

The track exists to serve a specific flow of material. Commodity, origins, destinations, volume, railcar type, loading method, service frequency, and expected growth define the project.

Commodity and annual carload volumeOrigin, destination, and connecting carrierRailcar type, length, weight, and handling requirementsLoading, unloading, storage, and service expectations
Conceptual illustration · not an engineering drawing
What We Review

The track must work geometrically, operationally, and commercially.

A strong concept tests the full operation—not only whether rail can physically reach the property.

01

Connection point

Existing railroad, turnout location, ownership, access, main-track impacts, and connection requirements.

02

Alignment & curvature

Track routing, usable tangent length, curve locations, equipment compatibility, and property constraints.

03

Grade & drainage

Vertical profile, car securement, loading requirements, earthwork, drainage, and site resilience.

04

Clearances

Buildings, roads, utilities, loading systems, adjacent tracks, employee access, and equipment envelopes.

05

Switching movements

How cars enter, exit, are spotted, pulled, stored, and handled without obstructing the operation.

06

Capacity

Current car count, service frequency, storage needs, growth expectations, and future track additions.

07

Loading & truck flow

Pads, pits, conveyors, docks, scales, staging, turning movements, warehousing, and material handling.

08

Construction & approvals

Engineering, permits, agreements, insurance, access, contractor qualifications, inspection, and acceptance.

Aerial view of an industrial property adjacent to active railroad track
Track, building, roadway, utilities, drainage, loading, and expansion should be evaluated as one connected site plan.
Start With the Complete Operation

A site can have rail nearby and still be difficult to serve.

Distance from the railroad is only one factor. The connection may require difficult curvature, excessive grade, property rights, relocation of utilities, road crossings, drainage work, or operating movements that the site cannot support.

Early review helps identify those limitations before the project team commits to a building footprint or invests in detailed design.

✓
Preserve a workable rail corridorReserve enough width and length for the turnout, curves, tangent track, and clearances.
✓
Protect loading and switching spaceAllow cars to be placed, worked, secured, and removed without disrupting the facility.
✓
Coordinate roads, utilities, and drainageAvoid conflicts that make later rail construction more costly or impractical.
✓
Plan for growthConsider additional car capacity, storage, loading positions, and future expansion.
Common Project Types

Different rail-access needs require different track concepts.

01

New industrial siding

Create direct rail access for a new manufacturing, processing, distribution, agricultural, or bulk-handling facility.

02

Siding reactivation

Evaluate an existing or former industrial track for condition, access, geometry, switching, and return to service.

03

Expansion & storage

Add loading positions, storage tracks, runaround capability, car staging, or capacity for future traffic growth.

04

Transload & team track

Develop a shared or dedicated rail-to-truck facility when the end customer does not have a private siding.

Designed to Work After Construction

The finished track must support the railroad, the customer, and the service plan.

A technically constructible track can still create operating problems if it does not provide enough capacity, safe access, appropriate loading clearances, or practical switching movements.

Railroad involvement helps connect the engineering design with the way trains and railcars will actually be handled after the project is complete.

Customer / property ownerDefines the freight, facility, loading process, business requirements, property, and project timing.
RailroadReviews connection, operating fit, standards, approvals, access, switching, and service preparation.
Qualified engineerCompletes survey, detailed geometry, grading, drainage, structural, and construction documents.
Contractor & partnersCoordinate cost, materials, construction, utilities, permits, funding, and project execution.
Aerial view of railroad yard tracks and staged railcars
Track capacity, car flow, switching access, storage, and future growth are operating decisions as much as engineering decisions.
Start the Review

What should you send the railroad?

A complete engineering package is not required for the first conversation. Share the best information currently available, and the team can help identify what should be studied next.

01LocationAddress, parcel, map, survey, or conceptual site plan.
02FreightCommodity, origins, destinations, annual tons or carloads.
03EquipmentRailcar type, length, weight, ownership, and handling needs.
04CapacityCars per shipment, spots required, storage, and service frequency.
05FacilityBuilding, loading system, truck flow, utilities, and expansion needs.
06ScheduleSite-control status, engineering stage, funding, construction, and startup timing.
Important design and approval note

LA&L may provide early railroad review, operating input, conceptual coordination, and project guidance. Conceptual layouts and preliminary observations are not final engineering documents. Detailed design must be completed by appropriately qualified professionals and is subject to railroad standards, applicable requirements, agreements, permits, and final railroad review and approval before construction or service.

Bring the Railroad in Early

Have a siding, expansion, reactivation, or transload concept to review?

Share the proposed location, commodity, volume, railcar type, loading plan, site information, and project schedule. LA&L can help identify the first operating questions and the right next steps.